The Kenya National Highways Authority (KeNHA) is set to upgrade the 23-kilometre Maai Mahiu escarpment highway to a four-lane highway, easing decades of transport challenges. The highway, built by Italian prisoners of war in the 1940s, runs through Nakuru and Kiambu counties, linking the Rift Valley, Mount Kenya and Nairobi regions. This upgrade is expected to alleviate traffic snarl-ups caused by trucks breaking down on the steep, rocky terrain.

The Maai Mahiu escarpment highway is a key link between Nairobi, Western Kenya, and neighbouring East African countries. President William Ruto announced that approximately 7,000 kilometres of roads were under construction across the country, with a target of tarmacking 28,000 kilometres and dualling 2,500 kilometres of highways. The upgrade of the Maai Mahiu-Naivasha road is a priority for the administration.

The Italian prisoners of war built not only the highway but also a historic church at the foot of the escarpment, known as the Travellers' Chapel. The church, built in 1942, is recognised as the smallest church in East Africa and has a unique pentagonal architectural structure. It operates 24 hours a day and has an open-door policy, allowing motorists to stop for prayers or conduct weddings.

The planned upgrade has raised concerns among residents and motorists about the fate of the church. Ann Nyakio, the church's caretaker, expressed fears that demolition would negatively affect tourism and religion. However, KeNHA stated that the design currently under consideration would not interfere with or disrupt the operations of the church facilities.

The Maai Mahiu escarpment highway is a critical route for thousands of trucks transporting goods to and from Tanzania, Uganda, the Democratic Republic of Congo, South Sudan, and Rwanda. The upgrade is expected to ease congestion and reduce accidents caused by the challenging terrain. President Ruto's administration is also constructing the Suswa-Ngong road to disperse traffic heading to Nairobi and other regions.

The upgrade of the Maai Mahiu escarpment highway is a major infrastructural undertaking that will solve decades of challenges for motorists. Narok Governor Patrick Ntutu said the expansion would ease congestion on the escarpment and provide an alternative route when the main road is blocked. The project sponsor has proposed to commence construction on the A8 South section in January 2027.

KeNHA confirmed that the project design is still under development and will be released once finalised. The authority assured that the sponsor is expected to monitor implementation progress and put in place mitigation measures to address any challenges that may arise. The upgrade is expected to be completed within a defined timeline, with the construction schedule being refined.

Key points

  • The upgrade of the Maai Mahiu escarpment highway to a four-lane highway is expected to ease transport challenges and reduce accidents caused by the challenging terrain.

Reporting sources

Share this story

Written by

SaharaWire Newsroom
SaharaWire

Reporting for SaharaWire from the Nairobi bureau.