The 28 September Stadium in Guinea is nearing completion after an extensive renovation led by GUICOPRES BTP. The stadium, which has been closed for eight years, is set to host the Syli National football team on October 1 against Kenya. The renovation is part of a vision by President Mamadi Doumbouya and his government to upgrade the country's sports infrastructure. The project involved a significant mobilization of human and technical resources, with teams working day and night, including Sundays, for two and a half years.

The renovation included the installation of a natural grass pitch that meets FIFA and CAF standards, complete with integrated drainage and irrigation systems. The stadium's access and hospitality areas have also been revamped, with VIP parking areas and dedicated spaces for media personnel. Three walkways connect the exterior to the stands, improving spectator circulation and safety. The stadium now features 14 luxury boxes, as well as VVIP, VIP, and premium seating areas.

The stadium's facilities have been significantly upgraded, with three elevators providing access to the official lounge and other luxury boxes. Concession stands have been installed to improve spectator comfort during matches, and cafeterias have been added to make the stadium a vibrant destination before and after games. The media center has been fully equipped, and a press conference room and mixed zone have been created for post-match interviews.

The stadium's renovation was put to the test with two continental matches in September. On September 13, Horoya AC hosted JS Saoura, with the home team winning 3-1 and securing qualification. The match marked the stadium's first international fixture in three years, with the crowd creating a lively atmosphere. Sports Minister Cellou Baldé praised the strong mobilization of supporters.

Six days later, on September 19, the stadium hosted a second continental match between Hafia FC and AS Douanes. The game was played in heavy rain, which tested the stadium's organization, logistics, and drainage system. Despite the challenging conditions, the match was completed without incident, with the pitch and drainage system performing well.

The two test matches have given stakeholders confidence that the stadium is ready for the Syli National's return. The matches verified the stadium's access and circulation, hospitality areas, media facilities, and pitch and drainage system. The stadium's readiness will be put to the ultimate test on October 1, when Guinea hosts Kenya in a 2027 CAN qualifier.

The Syli National's return to the 28 September Stadium marks a significant milestone in Guinea's football history. The team has not played at the stadium since November 2020, and the renovated facility is expected to provide an electric atmosphere for the match. With the renovation complete and the stadium tested, all eyes will be on the October 1 match.

Key points

  • The 28 September Stadium has been renovated to meet FIFA and CAF standards, with a natural grass pitch and upgraded facilities.
  • The stadium has hosted two continental test matches, demonstrating its readiness for the Syli National's return.
  • The Syli National will face Kenya on October 1 in a 2027 CAN qualifier, marking the team's return to the renovated stadium.

Reporting sources

Share this story

Written by

SaharaWire Newsroom
SaharaWire

Reporting for SaharaWire from the Nairobi bureau.