Algerian authorities have announced that the road between Bou Ismaïl and Douaouda will be completely closed in both directions from 11 PM tonight until 6 AM tomorrow morning. This closure is necessary for the demolition of a pedestrian bridge in the Yaâkoubi Amar neighborhood of Douaouda, which has been deemed a safety risk due to its advanced state of deterioration. The bridge's condition posed a threat of collapse onto the road, prompting the authorities to take proactive measures.

The demolition of the bridge is part of a larger modernization project for the highway on this section of the Algerian coast. Several phases of construction have already caused temporary road closures in recent months, including in the AADL Fouka area, where similar disruptions forced drivers to take alternative routes. The nighttime demolition is intended to minimize disruptions to traffic.

To manage the closure, local authorities have designated two alternative routes for motorists. For those traveling from Bou Ismaïl to Algiers, the route will divert onto a communal road alongside École Yaâkoubi Amar, connecting to provincial road n° 57, and then rejoining the highway at the Colonel Abbas interchange.

For drivers heading in the opposite direction, from Algiers to Bou Ismaïl, the exit will be at the Colonel Abbas interchange, with traffic redirected onto national road n° 11, passing through Douaouda Marine and Fouka Marine before rejoining the highway at the Bou Ismaïl interchange. These alternative routes pass through urban and coastal areas with lower capacity than the highway, potentially leading to traffic slowdowns even at late hours.

The authorities stress the importance of safety for both motorists and construction workers. Drivers are advised to reduce their speed, follow temporary signage, and heed instructions from deployed agents. The return to normal traffic flow is expected by Monday morning, barring any unforeseen issues at the construction site.

This is not an isolated incident, as it forms part of ongoing efforts to upgrade and secure the highway infrastructure in the region. Residents and travelers have been adapting to periodic disruptions as various improvement projects are undertaken. The Tipaza wilaya aims to balance development needs with the convenience and safety of road users.

With the demolition and subsequent repairs, authorities aim to enhance the safety and efficiency of the highway network. Motorists are encouraged to plan ahead and allow extra time for their journeys, taking into account the potential for delays on the alternative routes. The successful completion of this project is expected to improve traffic flow and overall road safety in the area.

Key points

  • The demolition of the pedestrian bridge is part of a larger highway modernization project aimed at improving safety and traffic flow.
  • Two alternative routes have been designated for motorists to use during the road closure.
  • Authorities emphasize the importance of safety for both motorists and construction workers during the demolition and repair process.

Share this story

Written by

SaharaWire Newsroom
SaharaWire

Reporting for SaharaWire from the Nairobi bureau.