Egyptian Transport Minister Kamel al-Wazir on Sunday oversaw the entry into service of the first two new air-conditioned trains on Metro Line 1. The new trains are part of a deal with the French company Alstom to supply 55 new trains, comprising 495 air-conditioned coaches, for Metro Line 1, which runs from Helwan to New El-Marg.
Accompanied by French Ambassador to Cairo Éric Chevallier and other officials, Wazir took a ride on one of the new trains from Saray al-Qubba Station to Sadat Station. He then inspected the train's modern technical and technological features, emphasizing the importance of continuing to develop existing lines and providing safe, modern, and high-quality transport services to citizens.
The new train deal is a cornerstone of the plan to modernize the fleet for the first line, including the supply of 55 air-conditioned trains and modern equipment for the Tora workshop. The agreement also covers maintenance services for a period of eight years, along with comprehensive overhauls for each train, including all necessary spare parts.
The new trains feature advanced technical and technological specifications designed to ensure the highest levels of comfort and safety for passengers. These include modern air-conditioning systems, secure passageways between carriages, and surveillance cameras installed both in the driver's cab and throughout the carriages.
The minister noted that this system is incorporated into all modern public transport modes, including the metro, the Light Rail Transit, and the high-speed electric train network. A comprehensive control center will be established for all electric-powered rail transit systems, alongside a unified control center for the entire railway network, which spans a total length of approximately 10,000 kilometers.
The new trains also feature LCD screens inside the carriages to display information and instructions, as well as screens above the side doors to indicate the final destination. They include designated spaces for wheelchairs, equipped with securing mechanisms for people with disabilities, and illuminated electronic maps showing the route and stations.
The minister emphasized that the state's objective goes beyond just adding new trains to the first line; rather, it is implementing a comprehensive development process for every component of the system. This initiative aims to achieve a qualitative leap in service quality, operational efficiency, and safety and security standards.
Key points
- The new trains feature advanced technical and technological specifications designed to ensure the highest levels of comfort and safety for passengers.
- The agreement covers maintenance services for a period of eight years, along with comprehensive overhauls for each train.
- A comprehensive control center will be established for all electric-powered rail transit systems, alongside a unified control center for the entire railway network.
Reporting sources
- Two new trains enter service on Egyptian Metro Line 1 · Egypt Independent