Sierra Leone has commenced feasibility studies for the proposed Lungi Bridge project, marking a new step towards developing a direct road connection between Freetown and Lungi. The studies are being undertaken by US-based engineering company Acrow Corporation of America, with funding support from a grant provided by the United States Trade and Development Agency (USTDA).
The commencement was announced by the US Embassy in Freetown, which said representatives of Acrow Bridge had joined Sierra Leonean government officials for a kickoff meeting chaired by Chief Minister Dr David Moinina Sengeh. The feasibility studies are expected to establish the technical, environmental, traffic and financial requirements of the proposed bridge, which is intended to connect Tagrin on the Lungi side to Portee in Freetown.
In a separate update, Sengeh described the commencement of the studies as an important milestone, saying the project was moving beyond previous pre-feasibility assessments towards the development of a fully designed and costed proposal capable of attracting private-sector financing. He said the government expects a comprehensive feasibility study within six months.
The work will cover traffic projections, environmental considerations, financial assessments and other technical details required to establish the project’s viability. Sengeh also disclosed that the proposed design currently under consideration places the bridge’s landing point at the far eastern side, taking into account engineering and other design constraints identified during discussions.
The National Investment Board is coordinating the government’s engagement with relevant institutions, with the Professional Engineering Regulatory Council and the Institute of Engineers also included in the discussions. The USTDA grant is intended to support the feasibility work being undertaken by Acrow, a US engineering company that has engaged with the Sierra Leonean government on the proposed project over the past two years.
Sengeh said the government had also previously signed a memorandum of understanding with a Chinese company under different terms, adding that Sierra Leone remained open to partnerships with investors from different countries where proposals align with national priorities. He further disclosed that the US International Development Finance Corporation (DFC) had maintained its interest in financing the project.
The proposed bridge is expected to provide a direct road connection between Freetown and Lungi, where the country’s main international airport is located. Currently, passengers and other travellers rely largely on ferry services, water taxis and helicopter transfers to cross the estuary between the two locations. A direct road link could significantly improve access to the airport, facilitate the movement of goods and passengers, and support trade and economic activities.
Key points
- The feasibility studies for the proposed Lungi Bridge project are being undertaken by Acrow Corporation of America with funding support from the United States Trade and Development Agency (USTDA).