The state of Guinea's Kindia-Télimélé RN2 highway has become a significant concern for local residents, with daily struggles arising from its poor condition. Communities such as Ganimbaya, Baren Kinfaya, and Kinfaya face difficulties in transportation, affecting their daily lives and economic activities. Despite rehabilitation efforts starting over a year ago, residents claim to have seen little progress.

Mohamed Camara, a resident of Ganimbaya, expressed frustration over the impact of heavy trucks serving bauxite mining sites in Démoukoulouma. He stated that these trucks have caused damage to the road and raised concerns about safety. Camara also mentioned that work on the road stopped near his district without any communication. Residents demand assistance from authorities to address these challenges.

In Baren Kinfaya, Seydouba Camara described the situation as an abandonment of the local population. He emphasized the difficulties faced due to the poor road conditions, making it hard to travel to Kindia. Residents in the area have not seen significant work done on the road since last year's clearing efforts. They attribute the current state to the lack of attention from authorities.

Thierno Sadou Barry, a merchant in Kinfaya, highlighted that the local population was relocated from Kampama Kounkouré due to the Souapiti hydroelectric dam installation. Although promises were made to improve infrastructure, residents claim these have not been fulfilled. Barry pointed out that the road's condition hampers local economic activities, including access to the weekly market and regular traffic disruptions.

Fanta Touré, a spokesperson for women in Kinfaya, stated that despite initial promises, essential infrastructure such as roads, electricity, and access to clean water remains lacking. Women in the area engage in small-scale commerce, agriculture, and gardening but face significant challenges due to inadequate infrastructure. Touré urged authorities to provide assistance in addressing these concerns.

The contractor, EBC, responsible for work on the Sira Foré-Kambanya section, reported a 75% completion rate. However, residents argue that this progress has not been visible or beneficial to them. Local communities stress the need for authorities to intervene and address their concerns about the road and related infrastructure.

Residents along the Kindia-Télimélé RN2 highway continue to face daily hardships due to the road's poor condition. They call for urgent attention from authorities to improve the road and provide essential infrastructure. Until then, local communities will continue to struggle with transportation, economic activities, and access to basic necessities.

Key points

  • Local residents demand assistance from authorities to address road conditions and provide essential infrastructure.
  • Communities were relocated due to the Souapiti hydroelectric dam installation, with unfulfilled promises of improved infrastructure.
  • The poor road condition affects local economic activities, including access to markets and regular traffic.

Reporting sources

Share this story

Written by

SaharaWire Newsroom
SaharaWire

Reporting for SaharaWire from the Nairobi bureau.