The Public Procurement and Disposal of Assets Authority (PPDA) in Malawi is taking steps to ensure a smooth transition to electronic public procurement (e-procurement) by December 1. The authority has established a dedicated support hub in Lilongwe and plans to extend similar facilities to other regions. This move aims to help government institutions and suppliers adopt the Malawi National Electronic Procurement System (Maneps). The PPDA director general, George Mankhwala, announced this during a townhall meeting in Lilongwe.
The townhall meeting brought together procurement practitioners and suppliers to discuss the implementation progress and challenges of the e-procurement system. One of the major concerns raised was the unreliable Internet connectivity in remote areas. To address this, the PPDA has set up a support hub where staff will assist those facing challenges in implementing the system. Mankhwala emphasized that come December 1, 2026, the manual procurement systems will no longer be used, and every government department is expected to onboard the new procurement system.
The PPDA plans to establish similar hubs in the Northern, Eastern, and Southern regions, with eventual expansion to districts. These facilities will provide access to information and communications technology (ICT) infrastructure and technical assistance, particularly for suppliers and procurement practitioners facing difficulties navigating the electronic platform. This move is expected to address some of the operational constraints identified in a recent study on e-procurement adoption in Malawi.
A recent study titled ‘E-procurement adoption and perceived procurement efficiency in Malawi’ found that 72.1 percent of respondents reported significant reductions in procurement processing times. Another 91.2 percent reported improved documentation accuracy, although 35.3 percent indicated that manual procurement procedures have only been partially replaced. The study highlighted potential efficiency gains from e-procurement alongside infrastructure and capacity constraints.
The study also identified continuing constraints, including poor Internet connectivity, system downtime, limited ICT skills, and reliance on manual procedures for some approvals. The researchers recommended investment in ICT infrastructure, continuous training, and stronger technical support to improve adoption. However, they cautioned that the reported efficiency gains reflect respondents’ perceptions rather than independently verified changes in procurement performance.
The PPDA’s planned expansion of technical support facilities addresses some of the operational constraints identified in the study. The authority has yet to indicate when the regional and district hubs will become operational. The rollout of the e-procurement system comes as the government aims to improve the efficiency and transparency of public procurement processes.
The Lilongwe meeting was the second in a series of regional engagements aimed at raising awareness and preparing users for the transition to e-procurement. The PPDA is intensifying engagement with stakeholders ahead of the deadline, and the establishment of support hubs is a key step in ensuring that government institutions and suppliers are equipped to use the new system.
Key points
- The PPDA is expanding technical support services to facilitate the transition to mandatory electronic public procurement (e-procurement) in Malawi.
- A recent study found that e-procurement adoption in Malawi has led to significant reductions in procurement processing times and improved documentation accuracy.
- The PPDA plans to establish regional and district hubs to provide technical assistance and support to users of the e-procurement system.
Reporting sources
- PPDA moves to enhancee- procurement transition · The Nation