The federal government of Nigeria has initiated the construction of a new ultra-modern National Control Centre for the Nigerian Independent System Operator (NISO) in Osogbo, Osun State. This project aims to replace a 64-year-old facility that no longer meets the demands of running Nigeria's grid. The groundbreaking ceremony was performed by Vice President Kashim Shettima, accompanied by the Minister of Power, Joseph Tegbe.

The new control centre will provide NISO with complete, real-time visibility across the entire national grid network, enabling rapid intervention during system swings. According to Minister Tegbe, this initiative is a tangible proof of President Tinubu's resolve to resolve systemic vulnerabilities across the electricity value chain. The centre will feature fully integrated Supervisory Control and Data Acquisition (SCADA) systems, high-definition large-format display walls, and advanced grid analytics.

The new facility will enable system operators to identify emerging electrical faults before they escalate, schedule targeted preventive maintenance, and maximize the throughput of available generation and transmission assets. Additionally, the centre is engineered to bolster disturbance management, smooth the path for integrating utility-scale renewable energy resources, and solidify Nigeria's leadership and synchronization within the West African Power Pool (WAPP).

The control centre will be protected by advanced physical and cybersecurity architectures. Minister Tegbe noted that the primary outcome of this project will be a sharp decline in preventable blackouts and a noticeably more stable supply. However, he stressed that grid reliability is a holistic effort requiring sustained gas feedstock delivery, robust maintenance of high-voltage transmission lines, and capable distribution infrastructure.

The new control hub will supply the precise operational coordination necessary to translate upstream investments into stable, delivered electricity. Senior Special Assistant (Legal) in the Office of the Vice President, Bashir Maidugu, representing the Vice President, underscored that a stable, resilient power sector sits at the heart of President Bola Ahmed Tinubu's Renewed Hope Agenda.

Maidugu emphasized that sustainable electricity forms the bedrock of an effective economy, empowering industrial manufacturers, small business owners, and critical public services. He warned that Nigeria cannot manage a modern, dynamic, and interconnected transmission network using outdated legacy equipment. The control centre serves as the nerve centre safeguarding operational reliability.

Managing Director/CEO of NISO, Abdu Bello Mohammed, affirmed that the facility will dramatically elevate the operator's surveillance, streamline day-to-day coordination, and drive fast, evidence-based mitigation whenever disruptions occur. The project is expected to have a positive impact on Nigeria's power sector, ultimately contributing to economic growth and development.

Key points

  • The new control centre will provide real-time visibility across Nigeria's national grid network.
  • The project aims to reduce preventable blackouts and improve the stability of the power supply.
  • The control centre will feature advanced technologies, including SCADA systems and high-definition display walls.

Share this story

Written by

SaharaWire Newsroom
SaharaWire

Reporting for SaharaWire from the Nairobi bureau.