The Egyptian Ministry of Water Resources and Irrigation has announced the construction of a temporary ferry in the village of Ndidba in Lake Burullus, Egypt. This temporary measure aims to facilitate safe crossing for residents and students until the completion of a new bridge. The old pedestrian bridge in the area was demolished within 24 hours, with necessary site preparation and diversion works underway to allow for the construction of the new bridge.
According to Eng. Ahmed Idris, head of the General Authority for Water Resources and Irrigation Projects, studies and site investigations for the new bridge have been completed. Construction has begun, and the project is expected to be completed within four weeks, providing a safe crossing for residents and students. The temporary ferry will remain in operation throughout the construction period.
The Ministry of Water Resources and Irrigation has a comprehensive inventory of all bridges in need of maintenance across Egypt. Priorities for maintenance and replacement are determined based on urgency and citizen needs. The new bridge will be built in a location that is most convenient for residents, according to a specified timeline.
Eng. Ahmed Idris made the announcement during an interview on the Extra News channel. He emphasized that the temporary ferry was built safely and systematically to ensure smooth and secure passage for users. The construction of the new bridge is part of the ongoing efforts to improve infrastructure in the region.
The village of Ndidba has been without a pedestrian bridge since the old one was demolished. Local residents have been relying on alternative crossing methods, which can be hazardous, especially for students. The temporary ferry provides a much-needed solution until the new bridge is completed.
The Ministry of Water Resources and Irrigation is working to complete the new bridge within the specified timeframe. Once completed, the bridge will provide a safe and stable crossing for residents and students, improving overall accessibility in the region.
The construction of the temporary ferry and the new bridge demonstrate the Egyptian government's commitment to improving infrastructure and ensuring public safety. The project is expected to be completed soon, providing relief to local residents and students who have been affected by the bridge's demolition.
Key points
- The Egyptian Ministry of Water Resources and Irrigation builds a temporary ferry in Lake Burullus village to facilitate safe crossing until the completion of a new bridge.
- The new bridge is expected to be completed within four weeks, providing a safe and stable crossing for residents and students.
- The Ministry has a comprehensive inventory of all bridges in need of maintenance across Egypt, prioritizing repairs and replacements based on urgency and citizen needs.